基于集成交付理念的建设项目激励模型 被引量:4

Incentive mechanism for construction projects based on the IPD philosophy
原文传递
导出
摘要 为研究在集成交付理念下,项目特征、参与人特征、激励结构等因素对项目激励效果的影响规律,该文基于已有文献构建了多方激励模型。并结合文献和案例,运用博弈仿真方法分析研究项目优化潜力、项目目标设定、激励结构、参与人努力成本等因素对项目激励效果的影响。研究结果表明:所构建模型较为可行,项目优化潜力、项目目标以及团队努力成本等因素对项目的激励效果有重要影响;适当的参与人努力成本差异有利于项目成功;收益分配应避免过于悬殊,按照参与人努力成本差异进行分配的方式并不是最好的激励。 A multi party incentive model shows how the project characteristics, participant characteristics and incentive structure promote a project. The real effect of the participant cost, project optimization and incentive structure are illustrated through game simulations. The results show that the importance of the incentive model. High level of optimization potential, low team costs and the team members' cost variance contribute to the project success. The target cost setting, goal achievement compensation, and income distribution are critical project incentives.
出处 《清华大学学报(自然科学版)》 EI CAS CSCD 北大核心 2018年第3期317-323,共7页 Journal of Tsinghua University(Science and Technology)
基金 国家自然科学基金资助项目(51578300)
关键词 集成交付模式 激励模型 多方博弈 演化分析 integrated project delivery (IPD) incentive mechanism multi game model game simulation
  • 相关文献

参考文献5

二级参考文献49

  • 1Vanhoucke M,Debels D. The discrete time/cost trade- off problem: extensions and heuristic procedures [J]. Journal of Scheduling, 2007,(10) : 311-326.
  • 2Eshtehardian E, Afshar A, Abbasnia R. Fuzzy-based MOGA approach to stochastic time-cost trade-off prob- lem [J]. Automation in Construction, 2009, 18 (5): 692-701.
  • 3Pollack-Johnson B, Liberatore M J. Incorporating quali- ty considerations Into project time/cost tradeofI analysis and decision making [J]. IEEE Transactions on Engi- neering Management, 2006, 53(4): 534-542.
  • 4Lam K C, Ng S T. A cooperative Internet-facilitated quality management environment for construction [J]. Automation in Construction, 2006, 15(1):1-11.
  • 5Chan W K L,Wong F K W, Scott D. Managing con- struction projects in China-the transitional period in the millennium[J]. International Journal of Project Manage- ment, 1999, 17(4): 257-263.
  • 6Yung P, Lai L W C. Quality assurance in construction by independent experts: a case study of the efficiency performance of state-owned enterproses in china [J]. Environment and Planning B: Planning and Design, 2009, 36(4): 682- 697.
  • 7Chen Weitong, Chen T T. construction partnering in Critical Success factors for Taiwan [J]. International Journal of Project Management, 2007, 25(5): 475 484.
  • 8Meng Xianhai. Assessment framework for constructionsupply chain relationships: development and evaluation [J]. International Journal of Project Management, 2010, 28(7): 695-707.
  • 9von Branconi C, Loch C H. Contracting for major pro- jects: eight business levers for top management [J]. In- ternational Journal of Project Management, 2004, 22 (2) : 119-130.
  • 10Zheng D X M, Ng S T, Kumaraswamy M M. Apply- ing a genetic algorithm-based multiobjective approach for time-cost optimization [J]. Journal of Construction Engineering and Management, 2004, 130 (2) : 168 - 176.

共引文献61

同被引文献34

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部