摘要
针对岩土工程基坑支护的设计及施工现状,如深基坑土体取样缺乏代表性、深基坑开挖空间效应问题没有得到有效处理、力学参数的选择不合理等问题,提出相应的解决措施。鉴于此,为保证岩土工程深基坑支护的设计与施工工作能够顺利开展,需要详细分析设计与施工中遇到问题,找到问题的根源,提出问题解决方法,希望能为相关工作人员提供一定的参考与帮助。
In view of the design and construction status quo of foundation pit support for geotechnical engineering,such as the lack of representativeness of deep foundation pit soil sampling,the problem of spatial effect of deep foundation pit excavation is not effectively addressed,and the selection of mechanical parameters is not reasonable,the corresponding solutions are put forward. In view of this in order to ensure the geotechnical engineering deep foundation pit design and construction work can be carried out smoothly,requires a detailed analysis of the problems encountered in design and construction,find the root of the problem,put forward a method to solve the problem,hope to be able to give the relevant staff to provide certain reference and help.
出处
《建筑技术开发》
2018年第5期121-122,共2页
Building Technology Development
关键词
岩土工程
深基坑支护
设计与施工
geotechnical engineering
deep foundation pit support
design and construction