喀斯特地貌下拱桥斜桩综合施工技术研究与应用 被引量:2

Research and Application of Comprehensive Construction Technology of Inclined Pile in Karst Geomorphic Arch bridge
下载PDF
导出
摘要 公路工程中大跨径拱桥的设计多采用斜桩基础来传导分散拱圈所承担的荷载。工程施工中斜桩一般采用人工挖孔桩施工工艺。斜桩施工的安全质量控制的难度与当地地质水文情况、斜桩倾斜度及桩长息息相关。对斜桩传统施工方法中,在开挖支护、钢筋笼安装、模板吊装、混凝土浇筑和测量监控等方面存在的不足,进行了分析,对部分施工工艺进行了创新和改进,取得了较好效果;同时,对施工中遇到的斜桩塌孔现象,采取优化技术处理措施,成功地排除了施工难题,保证了工程安全顺利实施。 In the construction of arch bridge in highway engineering, the inclined pile foundation is mostly used to disperse the stress direction of the arch ring. In the process of digging holes with small radius oblique piles, with the increase of the depth and inclined piles, the excavation and construction of the technical requirements affect the overall quality of pile foundation, while monitoring methods and inclined pile in the case of sudden changes in geological conditions, to better deal with landslides, to ensure the quality and safety of the case, the protection of progress, the paper elaborate Excavation and support of inclined pile during excavation, the decentralization of reinforced cage, lifting and installation of forrnwork, measurement and monitoring methods, and optimization measures of inclined hole collapse.
出处 《建筑技术开发》 2018年第6期62-63,共2页 Building Technology Development
关键词 斜桩 塌孔 拱桥 batter pile hole collapse ~ arch bridge
  • 相关文献

参考文献5

二级参考文献28

共引文献39

同被引文献8

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部