期刊文献+

Concrete-Filled Steel Tube Arch Bridges in China 被引量:70

Concrete-Filled Steel Tube Arch Bridges in China
下载PDF
导出
摘要 In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key con- struction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world's longest CFST arch bridge-the First Hejiang Yangtze River Bridge. The main construction technologies of rein- forced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges-the Guangxi Yongning Yong River Bridge and the Yunnan-Guangxi Railway Nanpan River Bridge--is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges.
出处 《Engineering》 2018年第1期143-155,共13页 工程(英文)
关键词 Concrete-filled STEEL tube (CFST) ARCH BRIDGE Steel-reinforced CONCRETE ARCH BRIDGE CABLE-STAYED fastening-hanging cantileverassembly VACUUM-ASSISTED pouring in-tube CONCRETE Adjusting load by stay cables Concrete-filled steel tube (CFST) arch bridgeSteel-reinforced concrete arch bridge Cable-stayed fastening-hanging cantileverassembly Vacuum-assisted pouring in-tube concrete Adjusting load by stay cables
  • 相关文献

参考文献4

二级参考文献18

共引文献167

同被引文献621

引证文献70

二级引证文献279

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部