期刊文献+

大芦线二期浦星公路230 m下承式系杆拱桥设计 被引量:4

Design of 230-m Span Through Bowstring Arch Bridge in Dalu Line Phase Ⅱ Puxing Highway
下载PDF
导出
摘要 大芦线二期浦星公路主桥采用计算跨径230 m的下承式系杆拱桥,主拱为提篮式钢箱结构,主梁为钢-混凝土组合梁。介绍了该桥的工程概况、主要技术标准、建设条件及总体方案,对主梁、主拱、吊杆等主桥结构设计进行了详细的论述,并进行了主要构件的静力计算及主桥整体稳定分析。 The main bridge of Dalu Line Phase Ⅱ Puxing Highway is a 230-m span through bowstring arch bridge. The main arch is the basket-type steel box structure. The main girder is the steel-concrete composite girder. The article introduces the engineering situation, main technical standards, construction conditions and overall scheme of this bridge, discusses the main structural design of main girder, main arch and suspender in detail, and analyzes the static calculation of main components and the integral stability of the main bridge.
作者 鄢余文
出处 《城市道桥与防洪》 2018年第5期103-106,133,共5页 Urban Roads Bridges & Flood Control
关键词 大芦线二期 下承式系杆拱桥 提篮式钢箱拱肋 钢-混凝土组合梁 先梁后拱 Dalu Line Phase Ⅱ through bowstring arch bridge basket-type steel box arch rib steel-concrete composite girder pre-girder and post-arch
  • 相关文献

参考文献2

二级参考文献6

共引文献8

同被引文献44

引证文献4

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部