特高压变电站监控系统调试要点的研究 被引量:5

Research on Keys to Commissioning Monitoring System in UHV Substation
下载PDF
导出
摘要 分析特高压交流工程变电站监控系统的架构及调试特点,结合蒙西1 000 kV变电站实际测控调试试验,提出调试试验的重点内容可分为安装验收、物理接线调试、运行参数调试3项,特高压变电站监控系统调试的关键点为正确性、完整性、规范性、可读性的验证。通过对特高压变电站监控系统调试分析,可为后期特高压变电站监控系统调试、检修及运维等方面提供一定参考。 By researching the structure and commissioning features of supervision and control system in UHV substation,it refers the supervision and control system commissioning of Mengxi 1 000 kV substation. This paper pointes out installation inspecting,physical wiring commissioning and operating parameters commissioning. They are the significant substances of commissioning. This paper also proposes the keys to Commissioning Monitoring System in UHV Substation which are accurate,complete,regulatory and readable verification. It has certain reference for commissioning,overhaul operation of supervision and control system in UHV substation.
作者 冷欧阳 田立山 LENG Ouyang;TIAN Lishan(State Grid East Inner Monglia Electric Power Supply Co., Ltd., Hohhot, Inner Mongolia 010020, China)
出处 《东北电力技术》 2018年第4期8-10,共3页 Northeast Electric Power Technology
关键词 特高压变电站 监控系统 调试 UHV substation supervision and control system commissioning
  • 相关文献

参考文献2

二级参考文献15

共引文献18

同被引文献38

引证文献5

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部