双导梁架桥机架设95m小半径曲线桥预制T梁施工技术 被引量:16

Construction Technology of Erecting Prefabricated T-beam of 95m Small Radius Curve Bridge with Double-guiding-beam Erector
下载PDF
导出
摘要 结合某二级公路95m小半径曲线桥30m长预制T梁架设实践,对起重机、扒杆吊2种架桥方案进行比选后,分析了架桥机解决小半径曲线桥架设的可行性以及常用双导梁架桥机架设小半径曲线桥的原理和关键技术要点。重点介绍了架桥机拼装、喂梁、T梁安装、架桥机前移和尾部接长、架桥机过孔转向等施工工艺。 Combined with the erecting practice of the 30 m long prefabricated T-beam of 95 m small radius curved bridge in a secondary highway,two bridge erection schemes for cranes and derrick hoists were compared and selected,and the feasibility of erecting a bridge with small radius curved bridge and the principles and key technical points of common double-guiding-beam erector for erecting small radius curved bridges were analyzed. The construction technology of bridge erector assembling,feeder beam,Tbeam installation,bridge erecting machine moving forward and tail lengthening and bridge passing crosshole steering were mainly introduced.
作者 谢蕴强 顾彪 XlE Yunqiang;GU Biao(China Gezhouba Group Three Gorges Construction Engineering Co. , Ltd. , Yichang, Hubei 443002, Chin)
出处 《施工技术》 CAS 2018年第10期82-86,共5页 Construction Technology
关键词 桥梁工程 双导梁架桥机 架设 曲线桥 T梁 施工技术 bridges double-guiding-beam erector erection curve bridge T-beam construction
  • 相关文献

二级参考文献16

共引文献30

同被引文献62

引证文献16

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部