摘要
针对大同站低压配电室新设备投入使用出现的问题,详细阐述了配电室低压柜拆换、封闭型母线及桥架安装、旅客地道及通信机房线缆敷设、避雷带及接地装置的设置等设计方案和施工技术及取得的效果,在铁路客运站房低压配电设备改造可进一步推广应用。
In view of the problems arising from the use of new equipment in the low-voltage distribution room of Datong Railway Station,the design schemes,construction techniques and effects of the low voltage cabinet dismantling are described,the enclosed bus and bridge installation,the cable laying of the passenger and communication machines,the installation of lightning arresters and grounding devices are elaborated in detail. It shows that,the transformation of low voltage power distribution equipment can be further promoted and applied.