复杂条件下地铁车站盖挖逆作法施工技术研究 被引量:12

Research on Top-down Reverse Construction Method of Subway Station Under Complicated Conditions
下载PDF
导出
摘要 随着城市轨道交通的快速发展,建造地铁车站的施工环境越来越复杂。以天津地铁5号线津塘路站为例,介绍了在复杂周边环境、软弱地层中盖挖逆作法施工工艺及关键技术措施。该工艺对地铁深基坑工程施工效率高、对周边环境影响较小、具有良好的社会效益和经济效益,可推广应用。 With the rapid development of urban rail transit, the construction environment of metro station is becoming more and more complex. Taking the Jintang Road Station of Tianjin Metro Line 5 as an example, this paper introduced the construction process and key technical measures of top-down excavation in the complicated surroundings and soft strata. The technology has good social and economic benefits and can be popularized and applied to the deep foundation pit engineering for its high construction efficiency and less influence on the surrounding environment.
作者 陈明 Chen Ming(China Railway 18th Bureau Group 5th Engineering Co. Ltd. , Tianjin 300450, China)
出处 《铁道建筑技术》 2018年第6期23-25,97,共4页 Railway Construction Technology
基金 中铁十八局集团有限公司科研课题项目(G13-14)
关键词 地铁车站 深基坑 盖挖逆作 施工技术 subway station deep foundation pit top-down excavation construction technique
  • 相关文献

二级参考文献47

共引文献43

同被引文献59

引证文献12

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部