国际EPC水电站改造项目设备采购实施研究 被引量:2

On the Equipment Procurement Implementation for Renovation Work of International EPC Hydropower Station Projects
下载PDF
导出
摘要 在国际EPC水电站改造项目执行过程中,数量众多的设备主要从国内企业采购,供货商水品和设备质量良莠不齐。在招评标和生产阶段,需要在控制价格的同时确保产品质量和生产进度。因此,应重视供应商选择、依据主合同内容签订采购合同、明确合同技术条款避免设计偏差、重视设备监造验收和包装管理等,以确保国际EPC水电站改造项目保质按期完成。 In the renovation work of international EPC hydropower station projects, a large number of equipment are purchased mainly from Chinese enterprises. Considering the big difference of the enterprise level and product quality, the product quality and manufacturing schedule should be ensured as well as the price control in the bidding and production periods. Thus, in the equipment procurement implementation, the choice of supplies should be emphasized. The procurement contract should be signed according to the main contract. Technical terms in the contract should be clarified to avoid design deviation. The equipment manufacture supervision and acceptance and the packaging management should also be emphasized. With these measures, the renovation work of international EPC hydropower station projects could be accomplished in satisfactory quality and schedule.
作者 李琳 LI Lin(Powerchina International Project Co.,Ltd.,Beijing 100036,China)
出处 《水电与新能源》 2018年第7期44-46,58,共4页 Hydropower and New Energy
关键词 EPC 海外水电站 机电改造项目 设备采购管理 EPC Overseas hydropower Station electromechanical renovation work equipment procurement management
  • 相关文献

参考文献4

二级参考文献20

共引文献16

同被引文献6

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部