摘要
基于CRH380D型高速列车转向架的设计结构,提出一种全新的检测与控制转向架安装关键尺寸的工艺方案并详细介绍了此工艺方案的主要设备、工作原理、操作过程及控制措施。
A completely new process scheme for measurement and control of key dimen- sions for bogie installation is presented based on the design structure of bogies for CRH380D high speed EMUs, along with a detailed introduction of main equipment, oper- ating principles, operating process and control measures.
作者
赵长晓
韩永新
郭立春
米佳
ZHAO Changxiao;HAN Yongxin;GUO Lichun;MI Jia
出处
《轨道交通装备与技术》
2018年第4期1-3,共3页
Rail Transportation Equipment and Technology