期刊文献+

地铁盾构下穿既有铁路施工控制技术探讨 被引量:12

Construction control technology of metro shield tunneling under-passing existing railway line
下载PDF
导出
摘要 以西安地铁5号线平村站—阿房宫站区间下穿西户铁路工程为背景,通过研究分析盾构下穿过程中地表沉降特点,提出盾构施工中调整土仓压力、掘进速度、注浆参数等技术措施。监测结果表明,采取的控制技术措施可以有效减小地表沉降,保证盾构顺利穿越既有铁路。 Taking the engineering works of Xi'an metro line 5 Pingcun Village station to Afanggong station section under-passing Xihu railway line as an example, through the analysis of characteristics of ground surface settlement during shield under-passing through construction, this paper puts forward some technical measures to adjust the earth pressure, driving speed, grouting parameters and other methods in shield tunneling. The monitoring results show that the control measures effectively reduces the surface subsidence, ensures the shielding smoothly under-passing the existing railway line.
作者 梁玉钊 Liang Yuzhao
出处 《现代城市轨道交通》 2018年第6期33-36,共4页 Modern Urban Transit
关键词 地铁 盾构施工 下穿铁路 地表沉降 控制措施 metro shield tunneling tunneling under-passing existing railway line surface subsidence control measures
  • 相关文献

参考文献2

二级参考文献14

共引文献69

同被引文献104

引证文献12

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部