期刊文献+

地铁盾构施工穿越高速铁路车站变形监测技术 被引量:7

Deformation Monitoring of High Speed Railway with an Undercrossing Metro Shield Tunnel
下载PDF
导出
摘要 常州市地铁盾构下穿沪宁高速铁路常州站,对车站的影响范围较大。首先,数值计算盾构施工引起的高速铁路结构和附属设施的变形;其次,高速铁路控制保护标准提出监控测量的范围、内容和频率,制定了监控测量方案;最后,施工过程中依据监测数据及时调整盾构施工参数,采用了测量机器人实时了解动态自动化监测系统,效果良好,经实践检验完全可行并具有应用推广价值。 The undercrossing metro shield tunnel has a significant effect on Changzhou Station on Huning high speed railway. Firstly,the deformations of the high speed railway and its auxiliary structures due to the shield construction was analyzed through numerical calculation. Secondly,the scope,content and frequency of the monitoring and measurement were presented based on the high speed railway controlling and protection standard,and a monitoring and measurement program was proposed.Finally,the shield construction parameters were adjusted in time based on the monitoring data.The automatic three-dimensional monitoring systems using measuring robots was used and its effect was verified.
作者 程岩 CHENG Yan(China Railway Shanghai Bureau Group Co. Ltd., Shanghai Hub Headquarters, Shanghai 200071, Chin)
出处 《铁道建筑》 北大核心 2018年第6期86-89,共4页 Railway Engineering
关键词 高速铁路 地铁盾构 行车安全 监控测量 自动化监测 High speed railway Metro shield Traffic safety Monitoring and measurement Automatic monitoring
  • 相关文献

参考文献7

二级参考文献57

共引文献152

同被引文献61

引证文献7

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部