沉管隧道钢壳高流动性混凝土浇筑施工技术 被引量:3

Construction Technology for Pouring High Flow Concrete of Steel Tube in Immersed Tunnel
原文传递
导出
摘要 论文基于大量国内外调研和国内现有相关设计标准、规范、研究理论成果的基础上,总结了国内外三明治结构沉管结构设计施工的实践经验。通过大量国外设计施工调研、工艺试验参数论证、可行性检测类型的成套技术咨询,依托港珠澳大桥岛隧工程最终接头施工实例,采用"引进、吸收、转化、创新"的思想制订了一套适合最终接头施工的技术方法。 Based on a large number of investigations in China and overseas countries as well as related design standards,specifications,and theoretical studies achievements,this paper summarizes the practical experience of design and construction of sandwich structure immersed tube at home and aboard,and through a large number of investigations and studies and verifications of test parameters as well as technical consulting of feasible monitoring types,relying on the example of the final joint construction of the Hong Kong-Zhuhai-Macao Bridge Island Tunnel project,the idea of "introduction,absorption,transformation,and innovation"is used to formulate a set of technical methods suitable for the final joint construction.
作者 苏怀平 王李 SU Huai-ping;WANG Li(China Communications 2nd Navigational Bureau 2nd Engineering Co.Ltd..Chongqing 401121,China)
出处 《公路》 北大核心 2018年第8期87-91,共5页 Highway
关键词 沉管隧道 最终接头 三明治结构 高流动性混凝土 immersed tunnel final joint sandwich structure high flow concrete
  • 相关文献

参考文献6

二级参考文献22

共引文献84

同被引文献33

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部