摘要 大同鹊山高家窑煤矿5202工作面在开采过程中遇到地质构造复杂、顶板破碎、来压明显等情况。为实现快速搬家,提高开采速度和煤炭回采率,通过钻探、巷探等技术手段,探明工作面情况,采用注浆加固,架设钢棚等方式,实现工作面快速安全撤架,为煤矿的高效安全生产提供了保障。 in the mining process, the 5202 working face of Gao Jia Shan Gao Jia Yao coal mine has encountered complicated geological structure, broken roof and obvious pressure and so on. In order to achieve rapid relocation, improve mining speed and coal recovery rate, through drilling and lanes and other technical means, we can identify the working face, use grouting reinforcement and erect steel shed to achieve fast and safe withdrawal of the working face, which provides a guarantee for the efficient and safe production of the coal mine.
作者 王奇 Wang Qi(Datong mountain high Jiashan Coal Industry Co., Ltd., Shanxi Datong 03710)
出处 《煤矿现代化》 2018年第6期53-54,58,共3页 Coal Mine Modernization
关键词 顶板破碎 综采工作面 快速搬家 broken roof fully mechanized face moving quickly
  • 相关文献

参考文献3

二级参考文献8

共引文献11

同被引文献21

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部