期刊文献+

三峡工程电站计算机监控系统设计 被引量:2

Design for Hydropower Plants Computer Supervisory and Control System of Three Gorges Project
下载PDF
导出
摘要 三峡工程共装设32台700MW水轮发电机组,计算机监控系统监控对象多、范围广、数据量大,设计难度大大超越其他水电站计算机监控系统。本文对左岸电站、右岸及地下电站两套计算机监控系统的总体结构、网络结构进行对照性介绍,并对监控系统设计过程中的关键技术设计方案进行了重点介绍。 There are totally 32 sets of 700MW turbine generator sets installed in three Gorges Projects. The quantity of the monitored objects of the computer supervisory and control system is a huge amount, the location is widespread, and the data volume is tremendous, all of these increase the difficulty of the system design greatly. The paper introduce the general structure and network structure of the computer supervisory and control system of left bank power station in compare with right bank and underground power station. Next, the key technology and solution in the process of system design were mainly presented.
作者 宋远超 吴刚 朱冠廷 SONG Yuanchao;WU Gang;ZHU Guanting(Changjiang Survey,Planning,Design & Research Co.,Ltd.Wuhan 430010,China)
出处 《水电与抽水蓄能》 2018年第4期22-26,共5页 Hydropower and Pumped Storage
关键词 三峡工程 计算机监控系统 总体结构 网络结构 冗余 Three Gorges project computer supervisory andcontrol system general Structure network structure redundant
  • 相关文献

参考文献3

二级参考文献2

共引文献17

同被引文献14

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部