摘要 新疆某会展中心二期工程展馆的钢屋盖采用张弦桁架结构形式,其中B区展馆的张弦桁架每榀标高各不相同。为对B区屋盖体系带柱滑移施工过程进行安全控制,采用大型通用有限元软件midas Gen对张弦桁架屋面结构进行施工仿真分析。介绍拉索张拉控制、带柱滑移不同步分析和风荷载对施工过程的影响。模拟分析的结果表明:对带柱滑移施工过程中的桁架拉索进行张拉时,张弦桁架结构符合各项控制指标;滑移不同步允许值随滑移结构桁架榀数的增加而减少,须精准控制滑移施工中的同步性;风荷载对滑移施工过程影响较小。 The steel roof of exhibition hall in phase II of an Exhibition Center project in Xinjiang is a truss string structure, and the elevation of each truss frames of the exhibition hall in Zone B is different. To realize safety control of slippage construction of roof system with column in Zone B, the general finite element software midas Gen was used for simulative analysis on construction of truss string truss roof structure. This paper introduced the cable stretching control, non-synchronization of slippage with column and influence of wind load on construction. It was found that the truss string structure satisfies various control indices in truss string stretching during slippage with column; the allowable value of slippage non-synchronization reduced after the increase of truss flame number, so accurate synchronization control was required during slippage construction; wind load produced very little influence of the slippage construction.
作者 万馨 赵海旭 苏英强 WAN Xin;ZHAO Hai-xu;SU Ying-qiang(College of Architecture and Civil Engineering,Inner Mongolia University of Science and Technology,014010,Baotou,hmer Mongolia.China;Zhejiang Jinggong Steel Building Co.,Ltd.,312030,Shaoxing,Zhejiang,China)
出处 《建筑技术》 2018年第9期1011-1015,共5页 Architecture Technology
关键词 张弦桁架 带柱滑移施工 施工仿真分析 张拉控制 truss string slippage with column simulative analysis of construction stretching control
  • 相关文献

参考文献5

二级参考文献26

  • 1王仕统,金峰,姜正荣.索—桁结构的静力分析及动力特性研究[J].空间结构,1999,5(4):31-38. 被引量:1
  • 2蔺军,董石麟,袁行飞.环形平面空间索桁张力结构的预应力设计[J].浙江大学学报(工学版),2006,40(1):67-72. 被引量:3
  • 3齐永胜.张弦梁单侧和双侧预应力张拉效果的对比分析[J].常州工学院学报,2007,20(1):25-28. 被引量:5
  • 4李永梅,王勇刚,张毅刚.索承网壳结构成形阶段拉索张拉顺序的研究[J].施工技术,2007,36(3):24-27. 被引量:6
  • 5KAWAGUEHI MAMORU, ABE MASARU, HATATO TATSUO,et al. Structural tests on the "suspendome" system[ C ]//Proceedings of lASS Symposium. A tlanta, 1994 : 384-392.
  • 6KAWAGUEHI MAMORU, ABE MASARU, TATEMICHI LKUO. Design and realization of "suspendome" system [ J]. Journal of theIASS,1999,40 (131) :179-192.
  • 7KANG WENJIANG,CHEN ZHIHUA,LAIN HEUN , et al. Analvand design of the general and out most-ring stiffened SUS-pend dome structures [J]. Eneering Structus, 2003,25:1685- 1695.
  • 8KAWAGUCHI MAMORU, ABE MASARU, TA TEMICHLLKUO. Design test and realization of "suspendome " system [J]. Journal of lASS , 1999 , 40 ( 131 ):179-192.
  • 9KAWAGUEHI MAMORU, ABE MASARU, HATATO TATSUO, et al . On mural system "suspendome" system [ C]//Proceedings of IASS Symposium.Istanbul, 1993:523-530.
  • 10Saiton M. Study on mechanical characteristics of a lightweight complex structure composed of a membrane and abeam string structure[A]. In: Pro of the IASS-ACSE Int[C]. New York, USA: ASCE, 1994.633-641.

共引文献32

同被引文献16

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部