风险防范项目的大修理资金分配原理与方法

Principles and Methods of Capital Allocation for Major Repair of Risk Prevention Projects
下载PDF
导出
摘要 限下大修理项目的预算分配是规划计划的工作重点和难点,工作繁杂、量大,而且资金预算分配主要依靠主观经验。以构成系统的基本单元为主体,利用差分序列加权法,通过致灾因子量的叠加进行权系数分配,将完全主观因素降到了最低,具有鲜明的理论价值与实际应用价值。 The budget allocation of the limited large repair project is the key and difficult point of the project planning.The work is complex and large,and the budget allocation of funds mainly depends on subjective experience.In this paper,in order to minimize the total subjective factors,we constitute the basic unit of system as the main body,using differential sequences weighting method through the superposition of disaster-causing factors weights allocation which have a theoretical and practical application value.
作者 李海涛 LI Haitao(PetroChina International Investment Corporation(Canada),Calgary T2P0W)
出处 《上海管理科学》 2018年第5期123-125,共3页 Shanghai Management Science
关键词 差分序列加权 大修理项目资金预算分配 致灾因子 difference sequence weighting budget allocation of funds for major repair projects disastercausing factors
  • 相关文献

参考文献9

二级参考文献40

  • 1张祖英.对新国民经济核算体系中分配核算理论方法的探讨[J].清华大学学报(哲学社会科学版),1992,7(1):21-28. 被引量:1
  • 2水本雅晴 刘凤璞(译).模糊数学及其应用[M].北京:科学出版社,1988..
  • 3李稻葵.重视GDP中劳动收入比重的下降[J].新财富,2007(9):40-41. 被引量:34
  • 4李凡.模糊系统理论[J]..
  • 5张广生.模糊测度论[M].北京:清华大学出版社.
  • 6Bertsimas D, Gupta S, Lulli G. Dynamic resource allocation a flexible and tractable modeling framework[J]. European Journal of Operational Research, 2014, 236(1) : 14 - 26.
  • 7Pal B B, Goswami S B, Sen S, et al. Using fuzzy goal pro- gramming for long-term water resource allocation planning in agricultural system: a case study [M]. Springer Berlin Heidel- berg: Mathmatical Modelling and Scientific Computation,2012: 170 - 184.
  • 8Du J, Cook W D, Liang L, et al. Fixed cost and resource alloca- tion based on DEA cross efficiency [J]. European Journal of Operational Research, 2014, 235(1) : 206 - 214.
  • 9Chang N B, Chang Y H, Chen H W. Fair fund distribution for a municipal incinerator using GIS-based fuzzy analytic hierarchy process[J]. Journal of Environmental Management, 2009, 90(1): 441 - 454.
  • 10Chow B G. Portfolio optimization by means of multiple tandem certainty-uncertainty searches[R]. Pittsburgh, USA: Rand Corporation, 2013.

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部