期刊文献+

南宁华润中心东写字楼项目核心筒变截面施工技术 被引量:2

Construction Technology of Variable Section for East Office Building Engineering of Nanning Huarun Center
下载PDF
导出
摘要 详细介绍了南宁华润中心东写字楼核心筒由六宫格转变为三宫格的施工技术,包括施工难点及解决措施,65~71层爬升规划及施工工艺,措施梁布置,南侧外爬模改造,70~71层4,5,6号筒施工,以及4,5,6号内筒顶模拆除。 This paper introduces construction technology of six-palace lattice transforming three-palace lattice for East Office Building engineering of Nanning Huarun Center,including construction difficulties and solving measures,climbing planning and construction technology in No.65-71 floors,layout of measured beams,transformation of external climbing formwork on the southern side,construction technology of No.4-6 tube in No.70-71 floors,demolition of top formwork for No.4-6 inner core.
作者 唐际宇 唐阁威 梁月利 唐章永 王翔 TANG Jiyu;TANG Gewei;LIANG Yueli;TANG Zhangyong;WANG Xiang(Guangxi Branch of China Construction Eighth Engineering Division Co.,Ltd.,Nanning,Guangxi 530028,China)
出处 《施工技术》 CAS 2018年第18期1-4,9,共5页 Construction Technology
基金 中建八局科技资助项目(2016-42)
关键词 高层建筑 核心筒 爬模 爬升 施工技术 tall buildings core tube climbing formwork climbing construction
  • 相关文献

参考文献7

二级参考文献41

共引文献42

同被引文献8

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部