期刊文献+

团柏煤矿301掘进面超前探测设计与应用 被引量:10

Advanced Detection Design and Application of 301 Heading Face in Tuanbai Coal Mine
下载PDF
导出
摘要 为了降低矿井水害对巷道掘进施工影响,保证施工巷道安全快速掘进。霍州煤电集团有限责任公司团柏煤矿水害防控工程技术中心通过技术研究,对煤矿探放水施工主要存在的问题进行合理分析,并对10#煤层301巷在掘进过程中提出了有效的探放水钻孔布置设计、钻孔封孔工艺以及探水施工安全技术措施,实践证明,取得了显著成效。 In order to mitigate water damage to the process of drifting in mines and ensure safe and fast driving in the coal roadway, according to technical research, the water disaster prevention and control engineering technology center of Huozhou Coal and Electricity Group Co., Ltd. analyzes the main problems existing in the construction of water exploration and drainage in coal mine, and puts forward the effective layout design of water exploration and drainage boreholes, the technology of hole sealing and the safety technical measures for water exploration and drainage in the course of excavation of No. 101 roadway in coal seam. The practice has proved that remarkable results have been achieved.
作者 郝乐 Hao Le(Tuanbai Coal Mine,Huozhou Coal and Electricity Group Co.,Ltd.,Shanxi Linfen 031400)
出处 《山东煤炭科技》 2018年第10期189-191,194,共4页 Shandong Coal Science and Technology
关键词 掘进巷道 超前钻探 钻孔设计 封孔工艺 安全措施 tunneling advance detection drilling design sealing process safety measures
  • 相关文献

参考文献5

二级参考文献14

共引文献30

同被引文献26

引证文献10

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部