期刊文献+

海洋石油平台立管陆地通球施工问题探讨 被引量:2

Analysis on Construction Problems of Onshore Riser Pigging of Offshore Oil Platform
下载PDF
导出
摘要 海洋石油平台立管在陆地预制安装后,需要使用曲屈探测器清理管道内杂质同时通过测量板外观损坏情况判断管道内径是否满足相关规范要求或焊道处是否有焊瘤等不合格的凸起点。在陆地立管通球过程中,除去立管焊接质量问题,有其他各项因素导致通球失败,不仅严重影响施工进度而且给业主方留下负面印象。本文叙述各种常见通球问题及其原因进行归纳整理,并提出合理可行的解决方案。 After platform riser is installed, the inner dirt of riser needs to be cleaned up by buckle detector. Meanwhile, it will be determined if the pipe diameter meets the related criteria or if the welds are unqualified through visual inspection of the gauging plate. Usually, besides the reason of welding, some other factors also lead to fail during onshore gauging, which can seriously reduce the construction progress and increase the construction cost. In this paper, common construction problems of onshore riser pigging were summarized as well as their causes, and a reasonable and feasible solution was put forward.
作者 王玉伟 郝敬雷 WANG Yu-wei;HAO Jing-lei(Offshore Oil Engineering Co.,Ltd.,Tianjin 300452,China)
出处 《辽宁化工》 CAS 2018年第9期933-935,共3页 Liaoning Chemical Industry
关键词 立管 通球 曲屈探测器 卡球 riser pigging buckle detector
  • 相关文献

参考文献4

二级参考文献14

共引文献40

同被引文献12

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部