摘要
应用全过程管理理念,将备件需求预测过程分为问题分析、数据获取与分析、方法选择与建模、模型求解、结果评估与应用5个阶段,分别对每个阶段进行了综述与分析,并对备件需求预测下一步研究趋势进行了展望,研究成果可为装备备件管理提供参考。
With the concept of whole process management,the spare parts demand forecasting process is decomposed into 5 stages: problem analysis,data acquisition and analysis,method selection and modeling,model solution,result evaluation and application,and then each stage is reviewed and analyzed respectively. The future research trend of spare parts demand forecasting is prospected,and the research results can provide reference for equipment spare parts management.
作者
杨帆
王生凤
王铁宁
吴龙涛
贾琦
YANG Fan;WANG Sheng-feng;WANG Tie-ning;WU Long-tao;JIA Qi(Equipment Support and Remanufacturing Department,Army Academy of Armored Forces,Beijing 100072,China;Teaching and Research Support Center,Army Academy of Armored Forces,Beijing 100072,China)
出处
《装甲兵工程学院学报》
2018年第3期25-29,共5页
Journal of Academy of Armored Force Engineering
基金
军队科研计划项目
关键词
装备备件
全过程管理
需求预测
equipment spare parts
whole process management
demand forecasting