期刊文献+

环江侏罗系油藏中高含水期高效开发技术对策研究 被引量:1

Research on production assignment and well completion design of segregated completion horizontal wells with Inflow Control Devices
下载PDF
导出
摘要 通过对环江侏罗系油藏的沉积特征、构造特征、储层孔渗特征及驱动能量等地质特征的深入分析,同时结合油藏实际生产动态,在生产实践中不断总结出"注水政策优化、水驱调整、套破井治理、更新井提采"等有效技术对策,为油藏的高效开发奠定了基础。 Through in-depth analysis of sedimentary characteristics,structural characteristics,reservoir porosity and permeability characteristics and driving energy of Huanjiang Jurassic reservoir,and combined with the actual production performance of the reservoir,effective technical countermeasures such as “water injection policy optimization,water drive adjustment,casing breakage treatment,renewal well recovery” have been summarized in production practice.It laid a foundation for the efficient development of the reservoir.
作者 罗天相 舒成龙 刘丽萍 田华 Luo Tianxiang;Shu Chenglong;Liu Liping;Tian hua(Xi'an University of Petroleum,Xi'an 710065,China;Seventh Oil Production Plant of Changqing Oilfield Company,Xi'an 710200,China)
出处 《云南化工》 CAS 2018年第9期30-31,共2页 Yunnan Chemical Technology
关键词 侏罗系 中高含水期 技术对策 bottom-waterreservoir ICD segregated completion production assignment design well completion design
  • 相关文献

参考文献2

二级参考文献35

  • 1罗万静,王晓冬,李凡华.分段射孔水平井产能计算[J].石油勘探与开发,2009(1):97-102. 被引量:15
  • 2王小秋,汪志明,魏建光.井筒与油藏耦合条件下水平井变质量流动规律研究[J].水动力学研究与进展(A辑),2005,20(3):326-331. 被引量:32
  • 3薛亮,汪志明,王小秋.注入比对水平井筒压降影响规律的研究[J].中国石油大学学报(自然科学版),2006,30(4):71-74. 被引量:2
  • 4DIKKEN B J. Pressure drop in horizontal wells and its effect on their production performance [ R]. SPE 19824, 1989.
  • 5LANDMAN M J, GOLDTHORPE W H. Optimization of perforation distribution for horizontal wells [ R ]. SPE 23005,1991.
  • 6ASHEIM H, OUDEMAN P. Determination of perforation schemes to control production and injection profiles along horizontal wells[ R]. SPE 29275,1995.
  • 7BREKKE K , LIEN S C. New and simple completion methods for horizontal wells improve the production performance in high permeability, thin oil zones [ R ]. SPE 24762,1992.
  • 8PERMADI P, WIBOWO W, ALAMSYAH Y, et al. Horizontal well completion with stringer for reducing water coning problems[ R]. SPE 37464,1997.
  • 9SINHA S, KUMAR R, VEGA L, et al. Flow equilibration towards horizontal wells using downhole valves [ R ]. SPE 68635,2001.
  • 10JANSEN J D, WAGENVOORT A M, DALING R. Smart well solutions for thin oil rims: inflow switching and the smart stinger completion [ R ]. SPE 77942, 2002.

共引文献15

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部