摘要 针对朱家包包矿西南帮边坡滑落失稳等问题,采用理论分析、现场监测等研究手段,对该矿西南帮1 180 m至1 270 m段高进行监测与分析。研究表明:边坡失稳产生了楔形体破坏,确定滑体稳定类型为可能滑动;失稳对采场安全生产带来严重隐患,通过扩帮清理1 180 m水平以上全部滑体,同时采用锚杆、锚索+肋柱挡板支护方式的治理方案,解除了滑体对采场安全生产的威胁,并恢复了1 270 m公路通车。 Aiming at instability and landsliding of the southwest slope in Zhujiabaohao mine, slopes at the height of 1 180 m to 1 270 m were monitored anti analyzed by means of theoretical analysis and fieht monitoring. The study showed that the slope instability caused wedge-shaped failure, and the stabilization type of the sliding body was det*~rluin^d as pc,ssible sliding; The instability brings serious hidden trouble to the safety production of the stope, and all the sliding bodies above the level of 1 180 m were cleaned up by expanding the slope. At the same time, the support scheme of bolt, anchor cable and rib baffle was adopted to relieve the safety threat of the sliding body to the stope, and the 1270 m highway reopened to traffic.
作者 敬小明 雍南 Jing Xiaoming;Yong Nan(China Craftsman International Engineering Design Co.,Ltd.,Panzbihua 617000,China;Pangang Group Mining Co.,Ltd.,Panzhihua 617000,China)
出处 《金属矿山》 CAS 北大核心 2018年第10期157-161,共5页 Metal Mine
关键词 边坡失稳 楔形体破坏 监测 稳定性分析 扩帮清理 Slope instability Wedge failure Monitoring Stability analysis Slope expanding and cleaning
  • 相关文献

参考文献6

二级参考文献57

共引文献100

同被引文献77

引证文献7

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部