摘要
静压预应力管桩施工周期短,适应范围广,无噪音,虽广泛应用于工程建设,但施工质量问题依然不可避免。以济南西客站安置三区B2地块为例,针对静压预应力管桩实际出现的施工质量问题进行分析,提出了解决预应力管桩施工中未达设计标高、承载力不足、桩身完整性差等问题的处理办法,工程经验可供类似工程参考。
The static pressed-in pre-casted prestressed reinforced concrete pipe piles have become increasingly popular due to their advantages of short construction period,applicable to a wide range of soils and minimized noise.The pile installation induced defects are unavoidably existed despite the effective quality control and quality assurance measures applied in the construction.This paper presents a case history of defect mitigation of pre-casted concrete piles installed in the third relocation residential district for the West Highspeed Rail Passenger Station Project in Jinan City.The defected pre-casted concrete piles are evaluated and categorized.Recommendations are proposed for piles that above the desired pile tip elevation,axial capacity that lower than the design value and piles having integrity concerns.
作者
孙春利
赵玉波
李志艳
张军
SUN Chunli;ZHAO Yubo;LI Zhiyan;ZHANG Jun(Shandong Construction Engineering(Group)Co.,Ltd.,Jinan 250014;Shandong Tianyu Engineering Project Consulting CO.,Ltd.,Jinan 250101;Jinan New Spring City Construction Project Management Co.,Ltd.,Jinan 250000;Geotechnical Engineering Research Center,Shandong University,Jinan 250061)
出处
《土工基础》
2018年第5期487-489,共3页
Soil Engineering and Foundation
关键词
静压法
预应力管桩
质量缺陷
处理方法
Static Pressed-In Pile Installation Method
Pre-casted Prestressed Concrete Pipe Piles
Pile Defect
Mitigation Methods