长周期大范围风电消纳的电力电量联合优化模型与应用 被引量:14

A Power and Energy Joint Optimization Model and Its Application for Long-term Large-range Wind Power Accommodation
下载PDF
导出
摘要 为解决目前中国面临的风电消纳难题,提出利用多元发输电资源在年度、月度等长时间周期,以及在跨区跨省等更大范围协调消纳,可提升风电等清洁能源的消纳水平。建立以系统运行成本最小为目标的长周期大范围风电消纳的电力电量联合优化模型,解决了时段耦合的电力电量联合优化建模,多元发电、发输电协调优化建模等长周期优化的关键问题,通过混合整数规划加以求解,实现了长周期大范围风电消纳的定量决策。利用某区域电网的电力系统实际算例对模型进行测试,算例分析表明,模型能够在长周期协调优化不同类型的发电机组与输电线路,提升风电消纳水平。 In order to solve wind power accommodation problem in China,this paper proposes to take advantage of clean energy”s long-term seasonal fluctuation characteristics over annual or monthly period,or to utilize the complementary nature of power supply and load characteristics in different regions.By building power and energy joint optimization model for long-term large-range wind power accommodation to minimize system operating costs,key problems like temporal-coupling power and energy joint optimization modelling problem, multi-generation, generation and transmission coordinative optimization modelling problem are solved.In addition,quantified decision making for long-term large-range wind power accommodation is achieved by using mixed integer programming (MIP).The model is tested with a practical example of a regional grid power system.The numerical example shows that the model can coordinately optimize different types of generating units and transmission lines in a long period,and improve the accommodation level of wind energy.
出处 《电力系统自动化》 EI CSCD 北大核心 2015年第18期145-150,共6页 Automation of Electric Power Systems
基金 国家自然科学基金资助项目(51477157) 国家电网公司科技项目(DZN17201400039) 江苏省社会科学基金项目(14EYD004) 中国电力科学研究院创新基金资助项目(DZ83-14-001) 南京工程学院创新基金项目(14EYD004)~~
关键词 风力发电 清洁能源 消纳能力 长周期 大范围 电力电量 联合优化 wind power generation clean energy accommodation capacity long-period large-range power and energy joint optimization
  • 相关文献

参考文献2

  • 1Venkatesh, B.,Peng Yu,Gooi, H.B.,Dechen Choling.Fuzzy MILP Unit Commitment Incorporating Wind Generators. Power Systems, IEEE Transactions on . 2008
  • 2ZHANG Kaifeng,GAO Zonghe.Invited session on dispatch and control of China power grid with large-scale wind integration. 18th International Federation of Automatic Control World Congress .

同被引文献206

  • 1Ilias DIMOULKAS,Mikael AMELIN,Fabian LEVIHN.District heating system operation in power systems with high share of wind power[J].Journal of Modern Power Systems and Clean Energy,2017,5(6):850-862. 被引量:6
  • 2谢克明,邱玉霞.基于数列模型的思维进化算法收敛性分析[J].系统工程与电子技术,2007,29(2):308-311. 被引量:8
  • 3魏军,罗四倍.基于信号奇异性检测的行波启动元件算法的探讨[J].继电器,2007,35(21):1-6. 被引量:14
  • 4刘吴.大型风电机组综合性能评估方法研究[D].北京:华北电力大学,2009.
  • 5SIEBERS T, KOOIJMAN H J, ROGERS D. Anemometer calibration method and wind turbine, U.S., 7823437[P]. 2010- 11-02.
  • 6Wind turbine generator systems: Part 12.1 power per{ormanee measurements of electricity producing wind turbines[S]. 2005.
  • 7WAGNER R, PEDERSEN T F, COURTNEY M, et al. Power performance measured using a nacelle lidar[J]. EWEA Annual Event 2011, 2011: 49-55.
  • 8WAGNER R. Procedure for wind turbine power performance measurement with a two-beam nacelle lidar [J]. DTU Wind Energy-E-0019, 2013 (1) : 5-26.
  • 9SMITH B, LINK H. Applicability of nacelle anemometer measurements for use in turbine power performance tests[C]// American Wind Energy Association (AWEA) WINDPOWER 2002 Conference, June 2 5, 2002, Portland, OR, USA 5-22.
  • 10HUNTER R, PEDERSEN T F, DUNBABIN P. Wind turbine testing procedure developments [ M ]. Danka Services International A/S, 2001.

引证文献14

二级引证文献312

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部