期刊文献+

潜水含水层中的非完整井降水设计计算探讨 被引量:11

Research on the Simplified Method of Design for Dewatering by Annular Partially Penetrated Wells in Phreatic Aquifer
下载PDF
导出
摘要 通过对潜水含水层中的非完整井基坑涌水量计算方法的分析 ,探讨引入抽水“有效带”的概念 ,将非完整井群涌水量计算转化为等效完整井群涌水量计算方法的可行性及由此产生的相对误差大小。通过几个实例计算表明 ,简化方法一般可将基坑涌水量计算误差控制在 2 0 %以内 。 Based on analyzing the discharge of the partially penetrated wells in phreatic aquifer,introducing the conception of 'the effective zone'of pumping,probing into the feasibility and comparative error by translating the calculation of the discharge of the partially penetrated wells into the calculation of the discharge of the equivalent completely penetrated wells.Several examples indicate that simplified method can control the comparative error of the discharge of one pit within 20percent,then prove that the simplified method to a certainly has practical value.
作者 刘俊龙
出处 《岩土工程技术》 2002年第5期297-301,共5页 Geotechnical Engineering Technique
关键词 潜水含水层 有效带 环形井点 非完整井 等效完整井 井点降水 phreatic aquifer the effective zone annular wells partially penetrated well equivalent completely penetrated well
  • 相关文献

参考文献1

  • 1常士骠.工程地质手册(第二版)[M].北京:中国建筑工业出版社,1982.891-910.

同被引文献78

引证文献11

二级引证文献97

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部