摘要 某火车站候车大厅整体装配式钢筋混凝土框架结构梁、柱普遍存在不同程度缺陷 ,其中框架梁严重病害开裂 ,危及正常使用。本文深入研究该结构病害表现 ,系统分析病害原因 ,详尽论述加固计算、设计及施工。 The defects to varying degrees occurred commonly on the structural beams and columes of the integral assembled reinforced concrete frame in the waiting hall at certain railway station.There were serious faulty cracks on the frame's beams,which endangered the proper operation.The paper researches deeply the appearance of such structural faults and analyzes systematically the reasons of these faults.The calculation,design and construction for the consolidation are expounded also in detail in this paper.
作者 祝珣
出处 《铁道工程学报》 EI 2002年第3期88-92,87,共6页 Journal of Railway Engineering Society
关键词 火车站 候车大厅 钢筋混凝土框架 加固设计 施工 waiting hall reinforced concrete consolidation design construction
  • 相关文献

同被引文献5

  • 1Analog Devices Inc. ADSP TS20XS TigerSHARC processor hardware reference [ R 1. ] [S. 1]. Analog Devices Inc, 2004.
  • 2徐盛,胡剑凌.TMS320DSP算法标准[M].北京:清华大学出版社,2007.
  • 3CESC25-90.混凝土结构加固技术规范[S].[S].,..
  • 4陈希哲.土力学地基基础[M].北京:清华大学出版社,1997..
  • 5张庆国.TMS320VC33高速数据采集的DMA实现[J].电脑编程技巧与维护,2007(10):74-76. 被引量:1

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部