摘要
以西三路排水工程雨水泵站为例,对泵站的工艺流程、泵的选型、泵池水位、地基加固等设计要点作了详细介绍,并对泵站节能进行了探讨,以更好地解决东营地区的雨水排涝问题。
This article describes the case study of rain water pump station in Xi-3 road drainage works in terms of its processflow,pump selection,water level of pump sump and foundation reinforcement.It also explores the energy saving for pump station toresolve the water flooded drainage in Dongying area.
作者
潘月宇
杨晓东
王孝兵
孙玉杰
Pan Yueyu;Yang Xiaodong;Wang Xiaobing;Sun Yujie(Petroleum Engineering Corporation,SINOPEC,Dongying 257026,China)
出处
《石化技术》
CAS
2016年第3期109-109,117,共2页
Petrochemical Industry Technology
关键词
排水工程
雨水泵站
地基加固
节能
drainage work
rain water pump station
foundation reinforcement
energy saving