摘要
盂县兴峪煤业22118综采工作面主采15~#煤,工作面采用全风压通风、一进两回通风系统。为更好地进行通风管理及进行瓦斯防治,确保工作面顺利安全高效的开采,特对工作面的风量核定进行了详细准备的计算,对瓦斯防治工作进行了系统安排。
15#coal in Yuxian Xing Yu coal 22118 fully mechanized working face is main mineable coal seam, adopts full air pressure ventilation system, one entry for intake air and two entries for return air, a two return ventilation system, to do well the management of ventilation and gas prevention and control, to ensure smooth, safe and efficient mining of working face need to verify the air volume of working face in detail, and systematacially arrange the gas prevention and control work.
作者
裴雷雷
Pei Lei-lei(Lu'an Group Lu Ning coal limited company security dispatching, Shanxi Ningwu 036706)
出处
《山东煤炭科技》
2017年第3期79-81,共3页
Shandong Coal Science and Technology
关键词
工作面
风量计算
瓦斯管理
working face
air volume calculation
gas management