摘要 基于徐州市轨道交通2号线周庄站—七里沟站区间下穿既有京沪铁路的实际情况,分析研究盾构下穿施工对京沪铁路地表(路基)沉降的影响,结合有关铁路轨道变形控制标准,提出盾构下穿京沪铁路的施工技术措施,保证了铁路运输安全。 Based on the actual situation of the section between Zhouzhuang station – Qiligou station of Xuzhou metro line 2 under-passing the existing Beijing-Shanghai railway line, this paper makes an analysis and a study of impact of the shield tunneling under passing construction on the settlement of surface (including roadbed) of the Beijing-Shanghai railway line. Taking into consideration of the railway track deformation control standards, it puts forward the construction technical measures of the shield tunneling under passing the Beijing-Shanghai railway line and ensures the safety of railway operation.
作者 邹朝阳 Zou Chaoyang
出处 《现代城市轨道交通》 2017年第4期29-33,共5页 Modern Urban Transit
关键词 城市轨道交通 盾构下穿铁路 技术措施 urban rail transit shield tunneling under passing railway line technical measures
  • 相关文献

参考文献2

二级参考文献9

共引文献14

同被引文献20

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部