期刊文献+

基于BIM和移动定位的施工质量管理系统 被引量:9

A Construction Quality Management System based on BIM and Indoor Positioning
下载PDF
导出
摘要 本研究基于建筑信息模型(Building Information Modeling,BIM)技术和室内移动定位技术,研制施工质量管理系统,用于建筑工程施工质量验收,以解决目前施工质量验收中规范实施过程中存在的漏检、数据二次转录等问题。本研究从施工质量验收相关规范出发,分析了施工质量验收的标准化过程与要求,并在此基础上设计了系统功能,建立了系统架构。然后提出了基于BIM的验收任务生成算法、移动定位集成方法等关键技术与方法,研制了施工质量管理的原型系统。最后,该原型系统在实际工程施工中进行了试用,验证了该系统的可行性。 This paper develops a prototype system for construction quality management based on Building Information Modeling(BIM)and indoor positioning,which is aimed to solve the problems in the traditional inspection process,such as omissions in quality inspection and second hand manual entry of the original inspection data into the computer software.In this research,based on the national standards for construction quality inspection in China,the standard process and requirements of construction quality inspection are analyzed,and then the functions and architecture of the system are designed.Next,an algorithm for inspection task generation is proposed based on BIM and a prototype system is implemented by integrating an indoor positioning technique.Finally,the prototype system is tested at a real construction site to verify its effectiveness and efficiency.
作者 马智亮 蔡诗瑶 杨启亮 毛娜 Ma Zhiliang;Cai Shiyao;Yang Qiliang;Mao Na(Department of Civil Engineering, Tsinghua University, Beijing 100084, China)
出处 《土木建筑工程信息技术》 2017年第5期29-33,共5页 Journal of Information Technology in Civil Engineering and Architecture
关键词 施工质量管理 建筑信息模型(BIM) 移动定位技术 工业基础类(IFC) Construction Quality Management Building Information Modeling(BIM) Indoor Positioning Industry Foundation Classes(IFC)
  • 相关文献

参考文献1

二级参考文献12

  • 1ParkC S, Lee D Y, Kwon O S, et al. A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template [J]. Automation in Construction, 2013, 33: 61.
  • 2Kwon O S, Park C S, Lira C R. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality [J]. Automation in Construction, 2014, 46 : 74.
  • 3Tsai Y H, Hsieh S H, Kang S C. A BIM-enabled approach for construction inspection[C]//Computing in Civil and Building Engineering. [S. 1.]: ASCE, 2014.-721-728.
  • 4马智亮,毛娜,刘赫、等.基于BIM技术的建筑工程施工质量监管系统框架没计[c]//第十七届全国工程建设计算机应用大会论文集.北京:人民交通出版社,2014:377-382.
  • 5buildingSMART. Model-Industry Foundation Classes (IFC) [S/ OL]. [2015-03-12]. http://www, buildingsmart, org/ standards/ifc.
  • 6Netherlands Organization for Applied Scientific Research. BIMServer. org. Github [ EB/OL]. [ 2015-03-14 ]. https:// github, com/opensourceBIM/.
  • 7BIMserver Netherlands Organization for Applied Scientific Research. bimvie, ws. Github [EB/OL]. [ 2015-01-17 ]. https://github. com/opensourceBIM/bimvie, ws.
  • 8Netherlands Organization for Applied Scientific Research. Plugin-Development of BIMServer. Github [ EB/OL]. [ 2015- 01-22 ]. https://github, com/opensourceBIM/BIMserver/ wiki/Plugin-Development.
  • 9孙斌艺.项目品牌与企业品牌的促进和隔离[J].中国房地产,2009(10):43-44. 被引量:1
  • 10马智亮.BIM技术及其在我国的应用问题和对策[J].中国建设信息,2010(4):12-15. 被引量:81

共引文献15

同被引文献236

引证文献9

二级引证文献148

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部