50000m^3外浮顶原油储罐施工要点

Construction Points of 50000m^3 External Floating Roof Crude Oil Storage Tank
下载PDF
导出
摘要 大型浮顶储罐储存量大,施工过程复杂,周期长,对施工方案要求比较高,在施工过程中需保证焊接质量,做好防变形措施。同时,施工过程中潜在危险性高,一旦发生事故,损失严重。本文通过对靖边原油库50000m^3外浮顶原油储罐施工过程的总结,对外浮顶储罐施工要点进行了梳理,希望为工程提供借鉴。 When it comes to large floating roof storage tank,with big storage capacity,complex construction process,long period,high requirements for the construction scheme,we should ensure the welding quality and do a good job of deformation prevention measures in the construction process.At the same time,there exists high potential risk in the construction process.Once the accident,serious losses.This paper summarizes the construction process of50000m3external floating roof crude oil storage tank in Jingbian crude oil reservoir,and combs the construction points of external floating roof storage tank,hoping to provide reference for the project.
作者 钟景 Zhong Jing(Pipeline Transportation First Branch of Shaanxi Yanchang Oil Group,Shaanxi,718500)
出处 《当代化工研究》 2017年第11期103-104,共2页 Modern Chemical Research
关键词 浮顶储罐 施工方案 防变形 floating roof storage tank construction scheme deformation prevention
  • 相关文献

参考文献1

共引文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部