摘要
随着城市的加速发展,超高层建筑越来越多地成为了城市的标志,当下的传统施工升降机技术已经无法满足目前的核心筒施工要求。大连国贸中心大厦作为当地近年来的的地标建筑之一,采用了许多新式施工工艺,所以,本文以大连国贸中心大厦项目为例,对采用钢平台爬升的核心筒施工升降机技术应用进行分析和总结。
With the acceleration of urban development,super high-rise buildings are increasingly becoming the symbol of the city.The current traditional construction elevator technology has been unable to meet the current core tube construction requirements.The China World Trade Center building of Dalian,as one of the landmark buildings in recent years,has adopted many new construction technologies.Therefore,taking China World Trade Center center building of Dalian project as an example,this paper analyzes and summarizes the application of core elevator construction hoist technology on steel platform.
作者
徐兵
XU Bing(Mechanical Construction Engineering Company,Shanghai Construction Engineering Second Construction Group Co.Ltd.,Shanghai 201800,China)
出处
《中小企业管理与科技》
2018年第12期190-191,共2页
Management & Technology of SME
关键词
钢平台
施工升降机
滑触线
steel platform
construction elevator
sliding contact line