摘要
以铺龙湾矿为例,针对通风系统复杂、管理难度大、漏风严重等问题,结合相关要求与技术标准,就通风系统优化进行了探讨,以满足矿井生产安全要求,提高通风系统整体性能,实现通风成本的有效控制。
Aiming at the existing problems of ventilation system in Pulongwan Colliery,such as complicated ventilation system,difficult management and serious air leakage,the author presents the optimization design based on the corresponding requirement and technology standards,which can improve the overall performance of ventilation system and realize the effective control of ventilation costs.
作者
吴志强
Wu Zhiqiang(Pulongwan Coal Industry Co.,Ltd.,Datong,Shanxi 037100)
出处
《江西煤炭科技》
2018年第3期127-128,131,共3页
Jiangxi Coal Science & Technology
关键词
通风系统
改造
优化设计
ventilation system
transformation
optimization design