摘要
以徐州城市轨道交通3号线07标段创业园站紧邻110 kV高压电塔的施工为背景,对既有建筑物的安全防护问题进行探讨,提出一种合理的防护思路,通过对高压线塔基础进行加固、采用合理的爆破方式及其他措施,有效的保证高压线塔基础在施工过程中不发生沉降及倾斜。
Taking Xuzhou urban rail transit line 3,07 blocks pioneer park station adjacent to the 110 kV high-voltage tower construction as the background,discusses both the structure of the safety problems,put forward a reasonable protection,to reinforce the basis of pylons reasonable blasting method and other measures,the effective guarantee of pylons foundation subsidence and tilt in construction process will not occur.