Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling

Presentation of a multi-index clustering technique for the mathematical programming of block-cave scheduling
下载PDF
导出
摘要 Long-term planning is one of the most important stages that determines the distribution of cash flows over the mine life and the feasibility of the project. However, it is not feasible in block caving to generate a production schedule that will provide optimal operating strategies without considering geotechnical constraints. This paper develops a mixed-integer linear programming(MILP) model to optimize the extraction sequence of drawpoints over multiple time horizons of block-cave mines with respect to the draw control systems. A multi-similarity index clustering technique to solve the MILP model in a reasonable time is also presented. Application and comparison of production scheduling based on the draw control system and clustering technique are illustrated using 325 drawpoints over 15 periods. The results show a significant reduction in the size of the MILP model, and in the time required to solve it. Long-term planning is one of the most important stages that determines the distribution of cash flows over the mine life and the feasibility of the project. However, it is not feasible in block caving to generate a production schedule that will provide optimal operating strategies without considering geotechnical constraints. This paper develops a mixed-integer linear programming(MILP) model to optimize the extraction sequence of drawpoints over multiple time horizons of block-cave mines with respect to the draw control systems. A multi-similarity index clustering technique to solve the MILP model in a reasonable time is also presented. Application and comparison of production scheduling based on the draw control system and clustering technique are illustrated using 325 drawpoints over 15 periods. The results show a significant reduction in the size of the MILP model, and in the time required to solve it.
出处 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2018年第6期941-950,共10页 矿业科学技术学报(英文版)
关键词 PRODUCTION SCHEDULING Block-cave mining Multi-similarity index clustering DRAW control system PRODUCTION rate curve Production scheduling Block-cave mining Multi-similarity index clustering Draw control system Production rate curve
  • 相关文献

参考文献1

二级参考文献8

  • 1Topal E,Kuchta M,Newman A. Extensions to an efficient optimization model for long-term production planning at LKAB's kiruna mine[M].Cape Town:APCOM,2003.289-294.
  • 2Dieting T. PC-BC:A block cave design and draw control system[A].2000.305-335.
  • 3Guest A,VanHout GJ,Von JA,Scheepers LF. An application of linear programming for block cave draw control[A].2000.
  • 4Dieting T. Computational considerations for production scheduling of block cave mines[A].Santiago,2004.135-140.
  • 5Rubio E,Dieting T. Block cave production planning using operations research tools[A].Santiago,2004.141-149.
  • 6Rahal D,Smith M,Van Hout GJ,Von Johannides A. The use of mixed integer linear programming for long-term scheduling in block caving mines[A].Cape Town:APCOM,2003.
  • 7Pourrahimian Y,Askari-Nasab H,Tannant D. Block cave production scheduling optimization using mathematical programming[A].Sudbury,2012.
  • 8Elkington T,Bates L,Richter O. Block caving outline optimisation[A].Sudbury,2012.

共引文献12