期刊文献+

TBM刀盘弹性变形研究 被引量:3

Study on the elastic deformation and finite element analysis of TBM cutter head
下载PDF
导出
摘要 刀盘是全断面岩石掘进机的关键部件,通过螺栓联接到刀盘大轴承并成为主机的重要组成部分。由于螺栓和刀盘都属弹性材料,刀盘与其轴承间的支撑联接关系在掘进过程中对刀盘形变有决定性影响,因此,论文通过对刀盘弹性变形理论模型的构建,分别给出了刀盘在简支和夹支支撑条件下的中面弯曲弹性变形方程并通过刀盘外载荷确定给出了两种支撑条件下刀盘变形曲线;通过有限元分析发现,刀盘的实际支撑应介于简支和夹支之间,其中简支约占12%~16%,夹支约占84%~88%,而刀盘弹性变形最大处位于其中心r=0.28 m的圆域内。此结论为全断面岩石掘进机施工过程中刀盘形变分析提供了借鉴。 As a key component of the full face rock tunnel boring machine,cutterhead is connected to the main bearing by bolt. Because bolt and cutterhead are both elastic materials, the supporting connection between cutterhead and bearing has a decisive influence on the deformation of cutterhead during excavation process. This paper established the elastic deformation model of cutterhead, presented the bending elastic deformation equations of neutral plane under simply-supported and clip-supported conditions respectively. Then,by giving out the load on cutterhead,the deformation curves under the above conditions are presented accordingly. Finite element analyses show that the actual support of cutterhead is a mode between simple support and clamp support, of which simple support accounts for 12%-16% and the clamped support accounts for 84%-88%. The maximum deformation of cutterhead occurred in its center and is located in a circular region with r=0.28m.This conclusion provides reference for further analysis of the deformation of TBM cutterhead during the excavation process.
作者 张照煌 洪文 孙显星 ZHANG Zhaohuang;HONG Wen;SUN Xianxing(School of Energy Power and Mechanical Engineering,North China Electric Power University,Beijing 102206,China)
出处 《中国水利水电科学研究院学报》 北大核心 2018年第6期549-554,共6页 Journal of China Institute of Water Resources and Hydropower Research
基金 国家自然科学基金项目(51475163)
关键词 刀盘系统 全断面岩石掘进机 载荷 弹性变形 cutterhead system full face rock tunnel boring machine load elastic deformation
  • 相关文献

参考文献5

二级参考文献39

  • 1张照煌,张得科,孟亮,孙飞,户秀妹.前倾安装盘形滚刀作用效果的理论分析[J].应用基础与工程科学学报,2012,20(S1):207-214. 被引量:9
  • 2张照煌,周纪磊,刘瑞华.全断面岩石掘进机刀盘轴承受力分析[J].应用基础与工程科学学报,2010,18(S1):225-232. 被引量:10
  • 3ZHANG Zhaohuang,MENG Liang,SUN Fei.Design Theory of Full Face Rock Tunnel Boring Machine Transition Cutter Edge Angle and Its Application[J].Chinese Journal of Mechanical Engineering,2013,26(3):541-546. 被引量:25
  • 4张照煌,叶定海.岩石跃进破碎特性的研究[J].矿山机械,2007,35(3):19-21. 被引量:8
  • 5Rostami J,Ozdemir L,Nilson B.Comparison between CSM and NTH hard rock TBM performance prediction models[C]//Proceedings of Institute of Shaft Drilling Technology(ISDT)annual Technical Conference96.Las Vegas,1996:11.
  • 6Gertsch R E,Rock toughness and disc cutting[D].Missouri:University of Missouri:Rolla,2000.
  • 7Zhao J,Gong Q M,Eisensten Z.Tunnelling through a frequency changing and mixed grnund:A case history in Singapore[J].Tunnelling and Underground Space Technology,2007,22(4):388-400.
  • 8ANTONIO C C.A study on synergy of multiple crossover operators in a hierarchical genetic algorithm applied to structural optimization[J].Structural and Multidisciplinary Optimization,2009,38(2):117-135.
  • 9ALMEIDA F S,AWRUCH A M.Design optimization of composite laminated structures using genetic algorithms anti finite element analysis[J].Composite Structures,2009,88(3):443-454.
  • 10SCHALAGEN E, VAN MIER J G M. Simple lattice model for numerical simulation of fracture of concrete materials and structures [ J ]. Materials and Structures, 1992,25:534-542.

共引文献66

同被引文献39

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部