综掘工作面长压短抽通风除尘方法的改进设计 被引量:10

Design of dust removal method of long pressing and short pumping ventilation in fully mechanized tunneling face
下载PDF
导出
摘要 通过分析凉水井煤矿综掘工作面产生粉尘的实际情况,改进了长压短抽通风除尘的方法,在原有局部通风系统的基础上增加了集尘罩、负压风筒、除尘器、附壁风筒,形成了一整套适合该矿掘进工作面生产条件的通风除尘系统,经实测,采用长压短抽的方法后掘进工作面生产时总粉尘浓度降尘率达92. 5%以上,降尘效果明显。 By analyzing the causes of dust in fully mechanized excavation face in Liangshuijing coal mine,the dust removal method of long pressing and short pumping ventilation was improved.On the basis of the original local ventilation system,dust collecting cover,negative pressure air cylinder,dust collector and wall-attached air cylinder were added,and a set of ventilation and dust removal system suitable for the production conditions of the tunneling face was formed.The actual measurement shows that the dust reduction rate of the total dust concentration in the heading face is over 92.5%,and the dust reduction effect is obvious.
作者 范鹏飞 张海军 刘喜亮 冉川 黎志 FAN Peng-fei;ZHANG Hai-jun;LIU Xi-liang;RAN Chuan;LI Zhi(Shaanxi Huisen Liangshuijing Mining Co.,Ltd.,Shenmu 719319,China;China Coal Technology Engineering Group Chongqing Research Institute Co.,Ltd.,Chongqing 400037,China)
出处 《陕西煤炭》 2019年第1期133-135,188,共4页 Shaanxi Coal
关键词 掘进工作面 综合机械化 长压短抽 通风除尘 tunneling face fully mechanization long pressing and short pumping ventilation and dust removal
  • 相关文献

参考文献12

二级参考文献60

共引文献133

同被引文献65

引证文献10

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部