期刊文献+

港陆钢铁公司焦化废水生化处理系统改造工程 被引量:3

Modification project for the biochemical treatment system of coking wastewater in Ganglu Iron and Steel Co.
下载PDF
导出
摘要 唐山港陆钢铁有限公司焦化废水生化处理系统水力停留时间短、出水水质差,严重影响了深度处理效果。针对系统存在的问题,在原废水处理设施基础上将厌氧池改为预曝气池,好氧池增加移动床生物膜反应器(MBBR)。实际运行结果表明:经合理改造后,生化处理系统运行稳定,处理效果良好,经混凝沉淀处理后,出水水质达到《炼焦化学工业污染物排放标准》(GB 16171—2012)的间接排放标准,为后续深度处理提供了有利条件。 The HRT in the biochemical treatment system of coking wastewater in Ganglu Iron & Steel Co.,Ltd.,Tangshan,was short and the water quality of the effluent was poor,which seriously affected the effect of advanced treatment. In view of the problems existed in the system,the anaerobic tank has been replaced by a pre-aeration tank and a moving bed bio-membrane reactor(MBBR) is added to the aerobic pool,on the basis of the original wastewater treatment facilities. The actual operation results show that the biochemical treatment system runs stably and the treatment effect is good,after reasonable modification. After coagulation and sedimentation treatment,the effluent quality reaches the indirect discharge criteria specified in the Discharge Standard of Pollutants for Coking Chemical Industry(GB 16171-2012),which provides favorable conditions for subsequent advanced treatment.
作者 岳丽芳 周红星 张连成 Yue Lifang;Zhou Hongxing;Zhang Liancheng(Department of Civil Engineering,Tangshan College,Tangshan 063000,China;Tangshan Ganglu Iron and Steel Co.,Ltd.,Tangshan 064200,China)
出处 《工业水处理》 CAS CSCD 北大核心 2019年第2期92-95,共4页 Industrial Water Treatment
基金 河北省高等学校自然科学重点项目(ZD2018310)
关键词 焦化废水 生化处理 移动床生物膜反应器 工程改造 coking wastewater biochemical treatment MBBR engineering modification
  • 相关文献

参考文献7

二级参考文献95

共引文献105

同被引文献34

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部