高速公路灰土挤密桩施工参数控制研究 被引量:1

Research on Construction Parameters Control of Expressway Lime Soil Compaction Piles
下载PDF
导出
摘要 近几年,灰土挤密桩在湿陷性黄土施工处理中取得了良好的效果,不仅施工速度相对较快,施工设备较为简单,其技术也日趋成熟,它注重挖弃方土的利用,避免了弃土对周围环境的影响,同时,它在施工过程中相比强夯、重锤夯实对附近房屋及居民生活影响较小,灰土挤密桩正式因为种种优势,逐渐在湿陷性黄土地基处理中被广泛的应用,为工程带来了良好的经济效益和社会效益。基于此,本文对高速公路灰土挤密桩施工参数控制研究进行了分析。 In recent years,the lime-soil compacted piles have achieved good results in the construction of collapsible loess.Not only the construction speed is relatively fast,the construction equipment is relatively simple,and its technology is becoming more mature.It pays attention to the utilization of the abandoned soil.It avoids the impact of spoil on the surrounding environment.At the same time,it has less impact on the nearby houses and residents'life than the strong and heavy hammers in the construction process.The lime-soil compacted piles are gradually collapsible due to various advantages.Widely used in the treatment of yellow soil foundation,it has brought good economic and social benefits to the project.Based on this,this paper analyzes the research on construction parameter control of highway lime-soil compacted piles.
作者 窦辉 DOU Hui(Gansu Gonghang Travel Tongding Expressway Management Co.,Ltd.,Dingxi Gansu 743000,China)
出处 《科技视界》 2019年第1期173-174,共2页 Science & Technology Vision
关键词 高速公路 灰土挤密桩 湿陷性黄土 Highway Lime soil compaction pile Collapsible loess
  • 相关文献

参考文献5

二级参考文献16

  • 1地质工学会.挤密砂桩设计与施工[M].日本,2009.
  • 2GBJ202-83.地基与基础工程施工及验收规范[S].[S].,..
  • 3湿陷性黄土地区建筑规范GB50025-2004[S],2004.
  • 4中交第四航务工程勘察设计院有限公司,中交公路规划设计院.港珠澳大桥主体工程岛隧工程沉管隧道基础工程(El-E6-s2)[R].广州:中交第四航务工程勘察设计院有限公司,2012.
  • 5The Overseas Coastal Area Development Institute of JAPAN. Technical Standards and Commentaries for Port and Harbour Facilities in Japan[M]. 2009.
  • 6MASAKI KITAZUME. The sand compaction pile method [M]. Japan : Taylor & Francis Ltd., 2005.
  • 7JTGF10.2006,公路路基施工技术规范[s].
  • 8莫景逸,黄晋申.挤密砂桩在海洋接岸地基加固工程中的应用[J].水运工程,2009(1):62-68. 被引量:9
  • 9李刚.灰土挤密桩在湿陷性黄土地基中的应用[J].路基工程,2010(1):178-180. 被引量:16
  • 10汪飞.洋山深水港区四期工程砂桩施工技术[J].中国港湾建设,2010,30(2):55-57. 被引量:3

共引文献38

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部