牵引变电所作为电气化铁路电力供应的主体,其高质量、高精度的设计、施工对整个铁路正常、安全、可靠运行具有重要意义。本文基于实际线路,通过构建BIM模型检查房建与变电专业碰撞,并利用BIM技术设计变配电所内电缆敷设方案,提升高铁供变电工程的施工工艺标准,满足变电所标准化、规范化、精细化施工的要求。
The traction substation,as a main body for power feeding to the electrified railway,with its high quality&high precision design&construction,has great significance to the normal,safe and reliable operation of the whole railway.The paper introduces the scheme design for power cables laying inside substation by application of BIM technology,based on the actual railway line,with establishing of BIM model to inspect the collision between civil building works and substation engineering,so as to improve the construction process standard for power supply and substation projects for high speed railway and meet the standardized,specified and elaborative construction requirements.