期刊文献+

昆明地铁首期工程电客列车进站冲标故障分析及处置

Fault Analysis and Disposal of the Inbound Elevation of the Passenger Trains in the First Phase of Kunming Subway
下载PDF
导出
摘要 昆明地铁首期工程列车在正线以ATO模式(自动驾驶)运营,由于信号、列车牵引、列车制动等多方面的系统联合控制的原因,列车存在冲标问题。本文通过对电客列车冲标问题的原因进行深入分析,制定相应处理措施,有效改善列车冲标。 The electric passenger train’s operation mode on the main line of the Kunming Metro Project phase one is ATO (automatic driving). Due to the joint control of signals, train traction and train braking, the train has a problem of exceeding the fixed parking line during the incoming station stage. This paper aims to analyze the reasons which caused the problem of exceeding the fixed parking line during the incoming station stage and to formulate a better corresponding treatment measures for improving the problem.
作者 温丽 余华强 Wen Li;Yu Hua-qiang
出处 《电力系统装备》 2019年第6期151-152,共2页 Electric Power System Equipment
关键词 地铁 冲标 电制动 气制动 metro exceeding the fixed parking line electric braking air braking
  • 相关文献

参考文献1

二级参考文献1

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部