基于多阶模糊综合评价的220 kV输电线路设计 被引量:1

Design of 220 kV Transmission Line Based on Multi-order Fuzzy Comprehensive Evaluation
下载PDF
导出
摘要 线路路径的选择在送出工程输电线路的规划中是一个十分重要的环节。首先,对模糊综合评价理论进行了介绍;然后,构建了普兰店国宏热电厂220 kV送出工程路径方案模糊综合评价模型,并详尽介绍了输电工程线路路径规划的理论和方法;最后,构建了国宏热电厂220 kV输电线路方案综合评价指标体系和模糊综合评价模型,根据实际勘测情况对送出路径备选方案进行综合整体评估,并对评估结果进行具体分析总结,选出国宏热电厂220 kV输电线路最优路径方案。 Route selection is a very important step in transmission line planning.In this paper,the fuzzy comprehensive evaluation theory is introduced,and then the fuzzy comprehensive evaluation model of the 220kV sending project path scheme of Pulandian Guohong Thermal Power Plant is constructed,and the theory and method of transmission line path planning are introduced in detail.Finally,a comprehensive evaluation index system and a fuzzy comprehensive evaluation model for the 220kV transmission line scheme of Guohong Thermal Power Plant is constructed.According to the actual investigation,a comprehensive overall evaluation is conducted for the alternative sending path,and the specific analysis and summary of the evaluation results are made to evaluate the optimal path scheme for the 220kV transmission line of Guohong Thermal Power Plant.
作者 吕相宇 王存旭 LV Xiang-yu;WANG Cun-xu(Graduate Department,Shenyang Institute of Engineering,Shenyang 110136,Liaoning Province;School of Automation,Shenyang Institute of Engineering,Shenyang 110136,Liaoning Province)
出处 《沈阳工程学院学报(自然科学版)》 2019年第2期180-184,共5页 Journal of Shenyang Institute of Engineering:Natural Science
关键词 模糊综合评价 路径选择 输电线路 Fuzzy comprehensive evaluation Path selection Transmission line
  • 相关文献

参考文献2

二级参考文献17

  • 1韩富春,任婷婷,陈晶晶.基于层次分析法的输变电工程项目后评价研究[J].电气技术,2009,10(2):42-45. 被引量:15
  • 2傅杰,李仁发.基于权值的优先调度算法[J].系统仿真学报,2005,17(10):2549-2551. 被引量:8
  • 3A P Von Der Merwe. Multi-project management organizational structure and control [J]. International Journal of Project Management, 1997, 15 (4): 223-233.
  • 4John D, Vincent A M. Evaluating project scheduling and due date assignment procedures: an experimental analysis [ J ]. Management Science (S0025-1909), 1998, 34 (1): 101-118.
  • 5Suvi Elonen, Karlos A Artto. Problems in managing internaldevelopment projects in multi-project environments [ J ]. International Journal of Project Management, 2003, 21 (6) : 395-402.
  • 6Desouza C Kevin, Evaristo J Roberto. Project management offices: a case of knowledge-based archetypes [ J ]. International Journal of Information Management, 2006, 26 (5) : 414-423.
  • 7Brian Hobbs, Aubry. A multi-phase research program investigating project management offices ( PMOs ) : the results of phase 1 [ J]. Project Management, 2007, 38 (1): 74-86.
  • 8Brian Hobbs, Monique Aubry, Denis Thuillier. The project management office as an organisational innovation [ J ]. International Journal of Project Management, 2008, 26 (5): 547-555.
  • 9邹江,邱有强.综合评价法在电网工程项目后评价中的应用[J].广东输电与变电技术,2008(4):37-39. 被引量:6
  • 10周效国,莫建兵.基于模糊神经网络的成功度法在电厂建设项目经济后评价中的应用[J].中国管理信息化,2009,12(5):90-92. 被引量:3

共引文献16

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部