摘要
随着我国大坝安全管理工作逐渐由传统的工程安全管理向工程风险管理方向发展,在役大坝风险水平成为了越来越重要的研究课题.混凝土坝实际运行过程中受到众多随机不确定因素和模糊因素影响,导致大坝自身风险率具有显著的时变特性,本文尝试引入二元高斯算法采用并联体系方法计算混凝土坝系统时变风险率,将时变风险率分析问题转化为静态并联体系失效概率计算问题,通过在广义随机空间内采用JC法计算固定时刻混凝土坝风险率,并基于首次超越概率理论转化为混凝土坝时变风险率.最后,在工程算例分析中以某混凝土重力坝沿坝基抗滑失效为例,通过引入合理的抗力和荷载效应随机过程变量模型,采用该算法对混凝土重力坝抗滑稳定时变风险率进行了分析,验证了该模型的有效性,具有一定的理论和工程应用价值.
With the gradual transition of dam safety management work from engineering safety management to engineering risk management in China,the dam risk degree has become a more and more important research field.Under the influence of mutiple random uncertain and fuzzy factors,the dam risk degree exhibits strong time-varying characteristics.This paper adopted the bivariate Gaussian method to compute the time-varying risk degree based on parallel-system method by transforming the time-varying risk computation into the risk computation of the failure of static parallel system.By computing the static dam risk degree at fixed times based on the JC method in generalized random space,the time-varying risk degrees were obtained based on first transcendental probability theory.Finally,the case study took a certain concrete gravity dam on the foundation interface as an example and the time-varying risk degree of the dam sliding failure was computed with the proposed method by introducing feasible random-process variable model of the resistance and load effects,verifying the effectiveness of the model,which is of certain theoretical and practical values.
作者
朱凯
郑雪琴
季卓豪
傅蜀燕
吴邦彬
戴波
ZHU Kai;ZHENG XueQin;JI ZhuoHao;FU ShuYan;WU BangBin;DAI Bo(State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Hohai University, Nanjing 210098, China;National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety, Hohai University, Nanjing 210098, China;Technology Center of State Grid Xinyuan Company Ltd.,Beijing 100761,China;College of Water Conservancy, Yunnan Agricultural University, Kunming 650201, China)
出处
《中国科学:技术科学》
EI
CSCD
北大核心
2019年第3期331-342,共12页
Scientia Sinica(Technologica)
基金
国家重点研发计划(编号:2017YFC0804607)
国家自然科学基金重点项目(编号:51739003)
国家自然科学基金(批准号:51479054
51779086
51579086
51379068
51579083
51579085
51609074)
国家重点实验室专项基金(编号:20165042112)
广西重点研发计划(编号:桂科AB17195074)
江苏高校优势学科建设工程资助项目(水利工程)(编号:YS11001)
江苏省2015年度普通高校研究生科研创新计划(编号:KYZZ15_0140)
水文水资源与水利工程科学国家重点实验室开放基金(编号:2016491811
2017491811)
云南省教育厅科学研究基金(编号:2016ZZX109)资助项目
关键词
混凝土坝
时变风险率
首次超越概率
二元高斯方法
随机过程模型
concrete dam
time-varying risk degree
first transcendental probability
bivariate Gaussian method
randomprocess model