期刊文献+

设备故障条件下生产计划的鲁棒性分析

Robust analysis of production planning under equipment failure conditions
下载PDF
导出
摘要 以有限产能批量问题为背景,假定生产过程受到泊松分布的设备故障影响,引入与故障相关的鲁棒性约束,并建立生产计划决策的模型.首先将这一随机规划问题转换为确定性模型,然后用优化软件Lingo求解.算例结果表明,基于故障期望的计划模型中各个周期满足产能约束的一致性较差,而新模型能达到较高的鲁棒性水平,对应的生产成本会有一定程度的上升,而随着鲁棒性水平的降低,生产成本呈阶段性下降趋势,并与基于故障期望的模型趋近;同时发现与后者相比,新模型在增加有限的生产成本(高约1.0%)条件下,可以获得较高(85%)的鲁棒性水平. In this paper, based on the Capacitated Lot-sizing Problem, it is assumed that the production process is affected by the Poisson distribution equipment failure, and the fault-related robustness constraints are introduced and the production planning decision model is established. This stochastic programming problem is first converted into a deterministic model and further solved by the optimization software Lingo. The results of the example show that the consistency of the capacity constraints in each cycle of the planning model based on the failure expectation is poor and the new model can achieve a higher level of robustness, and the corresponding production cost will increase to a certain extent. With the decrease of the level of robustness, the production cost shows a downward trend and approaches to the model that is based on failure expectation. At the same time, compared with the latter, the new model is capable of accomplishing a higher level of robustness (85%) with increase of a limited production cost (about 1.0% higher).
作者 徐晔雄 林文文 方志梅 王磊 周礽恺 张岳君 XU Ye-xiong;LIN Wen-wen;FANG Zhi-mei;WANG Lei;ZHOU Reng-kai;ZHANG Yue-jun(Faculty of Mechanical Engineering & Mechanics, Ningbo University, Ningbo 315211, China;Zhejiang Provincial Key Laboratory of Part Rolling Technology, Ningbo 315211, China)
出处 《宁波大学学报(理工版)》 CAS 2019年第3期50-54,共5页 Journal of Ningbo University:Natural Science and Engineering Edition
基金 国家青年科学基金(51605263) 浙江省自然科学基金(LQ16G010002) 宁波市自然科学基金(2017A610141)
关键词 生产计划 故障 鲁棒性 泊松分布 production plan failure robustness Poisson distribution
  • 相关文献

参考文献6

二级参考文献61

  • 1JANS R,DEGRAEVE Z.Meta-heuristics for dynamic lot sizing:a review and comparison of solution approaches[J].European Journal of Operational Research,2007,177 (3):1855-1875.
  • 2KARIMI B,GHOMI S M T,WILSON J M.The capacitated lot sizing problem:a review of models and algorithms[J].Omega,2003,31 (5):365-378.
  • 3QUADT D,KUHN H.Capacitated lot-sizing with extensions:a review[J].A Quarterly Journal of Operations Research,2008,6(1):61-83.
  • 4ALSYOUF I.Maintenance practices in Swedish industries survey results[J].International Journal of Production Economics,2009,121 (1):212-223.
  • 5MA Y,CHU C,ZUO C.A survey of scheduling with deterministic machine availability constraints[J].Computers & Industrial Engineering,2010,58(2):199-211.
  • 6WEINSTEIN L,CHUNG C H.Integrating maintenance and production decisions in a hierarchical production planning environment[J].Computers & Operations Research,1999,26 (10/11):1059-1074.
  • 7AGHEZZAF E H,JAMALI M A,AIT-KADI D.An integrated production and preventive maintenance planning model[J].European Journal of Operational Research,2007,181(2):676-685.
  • 8FITOUHI M C,NOURELFATH M.Integrating noncyclical preventive maintenance scheduling and production planning for a single machine[J].International Journal of Production Economics,2012,136 (2):344-351.
  • 9AGHEZZAF E H,NAJID M N.Integrated production and preventive maintenance in production systems subject to random failures[J].Information Sciences,2008,178 (17):3382-3392.
  • 10NAJID M N,ALAOUI-SELSOULI M,MOHAFID A.An integrated production and maintenance planning model with time windows and shortage cost[J].International Journal of Production Research,2011,49 (8):2265-2283.