摘要
以重庆市轨道交通5A线九龙半岛区域线站位方案研究为背景,从区域规划、线路敷设条件、工程实施难度等多方面对方案进行研究。通过兼顾方案与规划对接的合理性分析,并综合考虑工程可实施性,使得线站位方案达到功能性与实施性的平衡。
Based on the study of the station location scheme for the Jiulongbandao area along Chongqing rail transit line 5A, this paper studies the solution from the aspects of district planning, track laying conditions, project implementation difficulties and so on. By taking into consideration of both the solutions and planning and the rationality analysis of the connection and interfaces, and taking the engineering implementability into account comprehensively, the line and the station plan achieve a balance between the functionality and the implementation.
出处
《现代城市轨道交通》
2019年第5期96-99,共4页
Modern Urban Transit
关键词
城市轨道交通
线站位
方案
研究
urban rail transit
line alignment and stationlocation
solution
research