构皮滩垂直升船机金属结构和机械设备设计研究 被引量:13

Design and research on metal structure and mechanical equipment of vertical ship-lift in Goupitan Hydropower Station
下载PDF
导出
摘要 构皮滩升船机工程由三级升船机组成,其中第一、三级升船机是目前国内外已建或在建的规模最大的下水式垂直升船机,其主提升机提升力位居国内乃至世界上所有垂直升船机之首;第二级升船机为国内乃至世界上单级提升高度最大的垂直升船机。对构皮滩三级升船机金属结构、机械设备的总体设计方案做了系统介绍,并简要总结了设计中的几个关键技术问题,包括平衡重重量确定、大型减速器研发、船厢纵倾稳定性试验等。研究成果可为同类型升船机的设计提供有益借鉴。 The ship-lift of Goupitan Hydropower Project consists of three-stage ship-lifts. The first and the third stage ship-lifts are the largest submersible vertical ship-lift built or under construction at home and abroad. The lifting power of the main hoist is the largest in China and even in the world; The hoisting height of the second-stage ship-lift is the highest in China and even in the world. The general design scheme of metal structure and mechanical equipment of the three-stage ship-lifts is systematically introduced, and the key technical problems in design process are briefly introduced, including the determination of balance weight, the development of large-scale reducer, the trim stability in ship chamber, etc. The research results can provide a useful reference for the design of the same type of ship lift.
作者 余友安 廖乐康 金辽 LIN Bin;ZHANGYouyi;LUO Ke(School of Civil Engineering and Architecture,Southwest University of Science and Technology,Mianyang 621010,China)
出处 《人民长江》 北大核心 2019年第5期119-126,共8页 Yangtze River
基金 国家重点研发计划"重大水利枢纽通航建筑物建设与提升技术--200 m级大型垂直升船机成套技术"(2016YFC0402002)
关键词 船厢下水式垂直升船机 平衡重 船厢水动力学 纵倾稳定 构皮滩水电站 submersible vertical ship-lift balance weight hydrodynamics in ship chamber trim stability Goupitan Hydropower Station