提高摩擦提升机钢丝绳更换效率的施工工艺的研究

Study on Construction Technology for Improving Replacement Efficiency of Steel Wire Rope of Friction Hoist
原文传递
导出
摘要 为提高落地式摩擦提升机更换钢丝绳效率,针对传统换绳工艺进行了分析。研究、采用了一种专用换绳车与双码择绳调换智能保护装置相互配合的新型换绳工艺,与传统换绳工艺相比,新型换绳工艺大大降低了施工时间,节约了人力和物力,大大提高了效率。 In order to improve the efficiency of replacing wire rope for floor friction hoist,the traditional rope changing technology was analyzed. Studied and adopted a new rope changing technology which is matched by a special rope changing car, double code rope selecting and changing intelligent protection device. Compared with the traditional rope changing technology, the new rope changing technology greatly reduces the construction time, saves manpower and material resources, and greatly improves the efficiency.
作者 王红强 Wang Hongqiang(Hebi Coal Industry (Group) Co.,Ltd.,Hebi 458030,China)
出处 《煤矿机械》 北大核心 2019年第3期93-95,共3页 Coal Mine Machinery
关键词 摩擦提升机 钢丝绳 更换 效率 friction hoist wire rope replacement efficiency
  • 相关文献

参考文献3

二级参考文献4

  • 1严明霞,刘立,石博强.JKM4×4型多绳摩擦提升系统改造后的防滑核算[J].煤矿机械,2006,27(9):158-161. 被引量:2
  • 2潘英.矿山提升机械设计[M]{H}徐州:中国矿业大学出版社,2001.
  • 3李玉瑾.多绳摩擦提升机动力学研究与工程设计[M]{H}北京:煤炭工业出版社,2008.
  • 4国家安全生产监督管理局;国家煤矿安全监察局.煤矿全规程[S]{H}北京:煤炭工业出版社,2012.