低密度高强度支护技术在8118工作面煤巷的应用 被引量:3

Application of Low Density and High Strength Supporting Technology in Coal Roadway of 8118 Working Face
下载PDF
导出
摘要 为解决8118工作面回风巷在现有支护方式下巷道围岩变形量大的问题,通过对回风巷的地质情况进行具体分析,决定采用低密度高强度支护技术,结合低密度高强度支护原理对回风巷的支护方案进行具体设计,并对支护后的巷道进行矿压监测。结果表明:支护方案实施后,顶底板的最大移近量为144mm,两帮最大移近量为166mm,保证了巷道围岩的稳定。 In order to solve the problem that the deformation of the surrounding rock of the roadway in the 8118 working face is severe in the existing support mode,through the specific analysis of the geological conditions of the return airway,it is decided to adopt low-density and high-strength supporting technology.Base on the principle of low-density and high-strength support,the supporting scheme of return airway is designed in detail and the mine pressure monitoring in the roadway is carried out after supporting.The results show that the maximum roof-to-floor convergence is 144mm,and the maximum convergence of the two gangs is 166mm after the supporting scheme is implemented,which ensures the stability of the surrounding rock of the roadway.
作者 杨志鹏 Yang Zhi-peng(Shanxi Xinjing Coal Industry Co.,Ltd.,Shanxi Yangquan 045000)
出处 《山东煤炭科技》 2019年第6期22-24,共3页 Shandong Coal Science and Technology
关键词 煤巷 支护 技术 coal roadway support technology
  • 相关文献

参考文献4

二级参考文献41

共引文献50

同被引文献7

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部